14 July 2025

Notification of noisy work

Date

Time

Type of construction work

Where

Other

From July 21, 2025

Refurbishment of Unit

At specific periods during the summer, noise disturbances may occur, with some expected to begin from calendar week 30. These are highlighted in red in the demolition timeline. (Timeline demolition Panum 10-4)

Please be advised not to schedule noise-sensitive experiments – such as behavioural studies - during periods with planned construction noise.

Building 10-4 at Panum

July 1, 2025 From 07:00-07:30

Full-scale test of ABA

For further details please see here.

Building 10 as well as 4, 6, 12 and 16

May 28, 2025 From 15:00
Notice of Scheduled Power Interruption
Date: Wednesday, April 28
Reason: Maintenance work on the electrical panel in Building 10

Building Operations will be performing maintenance on the electrical panel, which will result in two periods of power interruption. These interruptions will only affect the ventilation system and the elevator in Building 10 that is units 10-2, 10- 3 and mini pigs.

Schedule for Power Interruptions:

3:00 PM–4:00 PM: Planned Power failure 
4:00 PM–8:00 PM: Power restored
8:00 PM–9:00 PM: Planned Power failure 
9:00 PM: Power restored

Important Safety Information:

Work that requires process ventilation – including the use of LAF benches, chemical cabinets, and extraction tables – must not be carried out during the outage periods.

There is also a risk that certain units may trigger alarms, such as pressure monitors and other systems connected to the ventilation.

Panum, building 10
May 20, 2025 New ADK is being installed, may cause drilling noise. Panum, 12-4-54

Previous messages

Noisy work in Panum building 4, 6, 10, 12 and 16 (31.01.25)

Topics